首页 体育内容详情
皇冠现金网(www.hg108.vip):RM1.8 billion allocated for 2022 federal road maintenance

皇冠现金网(www.hg108.vip):RM1.8 billion allocated for 2022 federal road maintenance

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

足球博彩公司www.hg108.vip)是一个开放皇冠即时比分、代理最新登录线路、会员最新登录线路、皇冠代理APP下载、皇冠会员APP下载、皇冠线路APP下载、皇冠电脑版下载、皇冠手机版下载的皇冠新现金网平台。足球博彩公司上登录线路最新、新2皇冠网址更新最快,足球博彩公司开放皇冠会员注册、皇冠代理开户等业务。

Works Minister Fadillah Yusof says the maintenance of federal roads is important to keep them in good condition. – The Malaysian Insight file pic, August 20, 2022.

A SUM of RM1.08 billion has been allocated for maintenance of federal roads throughout the country this year, said Works Minister Fadillah Yusof. 

He said of this amount, RM150 million is for maintenance works in the southern zone covering Pahang, Johor and Negri Sembilan. 

“Maintenance works in Pahang involve an expenditure of RM66.08 million, followed by Johor (RM60.9 million) and Negri Sembilan (RM23.63 million). 

“These maintenance works are important to keep these roads in good condition,” he told reporters in conjunction with the FTRoadpedia South 2.0 Tour in Klang today. 

Fadillah said proposals for road upgrade works on Federal Road FT050 from Ayer Hitam to Kluang in Section 33.8 until the Kluang Stadium junction in Section 49.1 would be submitted to federal authorities next year.

,

皇冠现金网www.hg108.vip)是一个开放皇冠正网即时比分、皇冠现金网开户的平台。皇冠现金网开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP,提供皇冠信用网代理开户、皇冠信用网会员开户业务。

,

Fadillah said the Phase 3B project, with an estimated value of RM385.13 million under the 12th Malaysia Plan, is aimed at reducing fatal accidents throughout the alignment. 

He said it is a continuation of the Phase 3A project worth RM219 million, which is under construction and expected to be completed in October 2024. 

“This location has recorded the most accidents in Malaysia due to the absence of road shoulders, medians and U-turns, with 52 accidents reported from 2020 to June 2022. 

“This road is the main toll-free route connecting Batu Pahat, Kluang and Mersing districts, and it will involve construction work on road shoulders, medians, U-turns and related works,” he added.

He also said an additional allocation of RM600,000 has been approved to upgrade streetlights along Federal Road FT050 to improve various aspects of road travel, especially towards the safety of road users. – Bernama, August 20, 2022.


转载说明:本文转载自Sunbet。

发布评论