首页 社会内容详情
以太坊块高度开奖(www.326681.com):HSS Engineers secures RM16.6mil VO for ECRL supervising works

以太坊块高度开奖(www.326681.com):HSS Engineers secures RM16.6mil VO for ECRL supervising works

分类:社会

网址:

SEO查询: 爱站网 站长工具

点击直达

欧博网址:(www.aLLbet8.vip),欧博网址开放会员注册、代理开户、电脑客户端下载、苹果安卓下载等业务。

KUALA LUMPUR: HSS Engineers Bhd's unit HSS Integrated Sdn Bhd has been awarded a RM16.6mil variation order (VO) to provide supervising works for Section 9 of the East Coast Rail Link (ECRL) from Serendah to Port Klang.

In a statement, the engineering consultant said the 53.5km section consists of tunnels, viaducts, at-grade sections and stations.

The VO pertains to the letter of appointment HSS Engineers received from China Communications Construction (ECRL) Sdn Bhd in December 2017 to provide supervising consultancy services for infrastructure works from Ch 0+000 to Ch 231+500 for a total contract sum of RM82.5mil.

,

以太坊块高度开奖www.326681.com)采用以太坊区块链高度哈希值作为统计数据,以太坊块高度开奖(联博统计)数据开源、公平、无任何作弊可能性。联博统计免费提供API接口,支持多语言接入

,

According to HSS Engineering executive director Sharifah Azlina Raja Kamal Pasmah, overall construction works for the ECRL were well underway with reported progress of 28.57% as at April 2022.

"We are heartened by the opportunity to reprise and even expand our role to carry on the project's momentum, especially in the crucial linkage in the Klang Valley," she said.

The project works are targeted for completion by the fourth quarter of the financial year ended Dec 31, 2027.

With the latest contract win, the group said its unbilled orderbook stands at RM530mil year-to-date, which will provide earnings visibility until 2027.


转载说明:本文转载自Sunbet。
  • 独∠空房 @回复Ta

    2022-08-28 00:57:55 

    With the appointments, only the chairmen for four states, Perlis, Kedah, Penang and Perak, have yet to be appointed.还有吗?还想看

  • usdt承兑商(www.usdt8.vip) @回复Ta

    2022-09-13 00:08:33 

    “我是靠做狗肉生意赚钱养家,餐馆是临街的楼房,收来的狗只能拴在店门口,别处没地方放。 ”冯先生表示,那些爱狗人士是主动上门要求把狗买下,他从来没有想过利用对方的善心牟利,他赚钱是靠餐馆不是卖狗。符合我审美

发布评论